During Week 35 (August 25–30), routes on the rope climbing walls will be reset. There will be ONE boom lift inside the facility.
Sign up so everyone doesn't arrive at the same time:
I’m happy to help
Want to help set routes?
- Contact Håkan Eklund via email: hakan@ergoholds.com
To make the route setters' job easier, we need assistance from the rest of you with the following tasks:
- Stripping holds: starting Monday evening using ladders (up to approx. 3–4 meters) and using the boom lift from Tuesday onwards.
- Remove the fall protection in front of the gate on Monday evening.
- The boom lift is arriving on Tuesday morning, and once it is in place, the holds and volumes can be removed.
- Transporting holds to and from the washing room.
- Washing holds: starting as early as Monday (or sooner).
- Sorting holds by color.
Once the holds have been stripped and washed, the route setters can begin creating new, interesting routes.
Help with cleanup is needed on Sunday, August 30, starting in the afternoon.
Which routes are being reset?
- Rope lines 5 (AB) and 8 on the New Wall, including the auto-belay (AB) line.
- Rope lines 14, 21 (AB), and 23 on the Main Wall.
- Rope numbering starts on the New Wall (1, 2, 3, etc.), continues to the right onto the Main Wall, and finally the Lead Wall.